Next up: It will take 2 days next week to rough in the electrical and we will be sheetrocking shortly after that.
Saturday, June 19, 2010
4010 107th Roofing and Chimney
This house was roofed and the HVAC was roughed in this week. The roof was left off around the chimney area because we are going to install a stucco chimney. It gets a little messy up there while they are doing it. This picture also shows the huge side patio and yard that will be on the side of the house rather than a back yard. The home owner will be able to access the covered patio from three different doors within the house.
Next up: It will take 2 days next week to rough in the electrical and we will be sheetrocking shortly after that.

Next up: It will take 2 days next week to rough in the electrical and we will be sheetrocking shortly after that.