Eddy's guys got the water lines installed today and ready for inspection. Once the slab is down, Chad and his guys will have a long way to travel across town to come and frame this house. Its all the way across the street from 4012 107th Street.
Monday, August 10, 2009
Subscribe to:
Post Comments (Atom)
Once the slab is down, Chad and his guys will have a long way to travel across town to come and frame this house. Its all the way across the street from 4012 107th Street.
ReplyDeleteplumbing company