Saturday, July 11, 2009

4012 107th Street Basement Progress

I chose to construct the basement for this house using the "trench" method. The perimeter of the basement is cut out using a 12' trenching blade. The trench is filled with #4 rebar and concrete. After the concrete cures for 1 week, the center is excavated and a concrete floor is installed. The center was dug out on Friday and I should be ready for basement trusses early this coming week.